Call Boards Call Priority
Call Priority ensures the most important leads are called first
What is Call Priority?
Call Priority determines the order in which leads are called.
Instead of calling randomly, Call Boards use a priority stack to decide who gets called first.
How Call Priority Works
You can define priority rules based on conditions such as:
Tags
Lead status
“Hot” leads
Every board includes a default Hot priority, which is always highest priority.
Priority Stack
The system works in layers:
Highest priority group (e.g., Hot leads)
Next priority group (e.g., specific tag)
Next group
All remaining leads
How the Dialer Uses Priority
When dialing:
The system works top to bottom, left to right
It completes one priority group before moving to the next
It moves across stages within each priority level
Important Behavior
Priority applies across all stages
Stage settings still apply while dialing
The dialer dynamically adjusts based on stage and priority