Skip to content
  • There are no suggestions because the search field is empty.

Call Boards Call Priority

Call Priority ensures the most important leads are called first

What is Call Priority?

Call Priority determines the order in which leads are called.

Instead of calling randomly, Call Boards use a priority stack to decide who gets called first.

How Call Priority Works

You can define priority rules based on conditions such as:

  • Tags

  • Lead status

  • “Hot” leads

Every board includes a default Hot priority, which is always highest priority.

Priority Stack

The system works in layers:

  1. Highest priority group (e.g., Hot leads)

  2. Next priority group (e.g., specific tag)

  3. Next group

  4. All remaining leads

How the Dialer Uses Priority

When dialing:

  • The system works top to bottom, left to right

  • It completes one priority group before moving to the next

  • It moves across stages within each priority level

Important Behavior

  • Priority applies across all stages

  • Stage settings still apply while dialing

  • The dialer dynamically adjusts based on stage and priority